web analytics

Natural Coir Fibre Roll Installation Guidelines

Site preparation

If vegetation is required, simply rake up Nutrient coir onto ground, then add Grass seeds/seedlings. Alternatively, for Soft Soils/Non-Corrosive Chemical Degraded Soils, lay Cormesh mat (F) or (CL) before Nutrient coir/Grass Seeds & Shoots/Vegetation Combination. Secure prepared Vegetation using cormesh (R)/(CL)/(POLY).

Site Preparation

Site Preparation

1. MAT
  • Slope Installation.
  • Shoreline Installation.
  • Channel Installation.

Channel Installation, Initial anchor trench, Check slot, longitudinal anchor.

Slope Installation

Slope Installation Diagram

2. ROLL
  • Slope Installation
    Attach Roll to bottom of Slope with Metal Staple Anchor peg. Shoreline Installation Simply fasten rolls between wooden stake using coir twine braid.
  • Shoreline Installation
    Simply fasten rolls between wooden stake using coir twine braid. Vegetate Rolls.
Channel Cross Sections

Channel Cross Sections

3. PILLOW
  • Desert installation
    Simply use metal staples to anchor pillow to ground.
  • Vegetate Rocky Area installation
    Simply fasten Pillow to Rocks with braid and vegetate.
Coir Pillow Mats

Coir Pillow Installation