Natural Coir Fibre Roll Installation Guidelines
Site preparation
If vegetation is required, simply rake up Nutrient coir onto ground, then add Grass seeds/seedlings. Alternatively, for Soft Soils/Non-Corrosive Chemical Degraded Soils, lay Cormesh mat (F) or (CL) before Nutrient coir/Grass Seeds & Shoots/Vegetation Combination. Secure prepared Vegetation using cormesh (R)/(CL)/(POLY).
1. MAT
- Slope Installation.
- Shoreline Installation.
- Channel Installation.
Channel Installation, Initial anchor trench, Check slot, longitudinal anchor.
2. ROLL
- Slope Installation
Attach Roll to bottom of Slope with Metal Staple Anchor peg. Shoreline Installation Simply fasten rolls between wooden stake using coir twine braid. - Shoreline Installation
Simply fasten rolls between wooden stake using coir twine braid. Vegetate Rolls.
3. PILLOW
- Desert installation
Simply use metal staples to anchor pillow to ground. - Vegetate Rocky Area installation
Simply fasten Pillow to Rocks with braid and vegetate.